Year: 2023
Customer: Enter Engineering PTE LTD (Singapore)
Contractor: Abrest International Limited (UAE)
Subcontractor: ABREST Energy Engineering LLC (Uzbekistan)
Facility: Solar PV plant with capacity of 250 MW
Works: Development the design and estimate documentation: “Power evacuation scheme of a photovoltaic plant with a capacity of 500 MW and an external power supply scheme for participants in the Karakul FEZ with the construction of a common substation 220/35/10 kV in the Karakul district of the Bukhara region”
Year: 2023
Customer: Navoi Solar Power Energy LLC (Uzbekistan)
EPC contractor: Enter Engineering PTE LTD (Singapore)
Contractor: Abrest International Limited (UAE)
Subcontractor: ABREST Energy Engineering LLC (Uzbekistan)
Facility: Solar PV plant with capacity of 250 MW
Works: Development the design and estimate documentation: “Detailed design of step-up substation of 220/35 kV of photovoltaic power station (PVS) with installed capacity of 250 MW in Navoi region” and “Detailed design of adjacent facilities of 220 kV “Bessopan” substation and 220/35/6 kV substation “PS5″ for the project of construction of a photovoltaic power station (PVS) with an installed capacity of 250 MW”
Year: 2023
EPC contractor: Enter Engineering PTE LTD (Singapore)
Contractor: Abrest International Limited (UAE)
Subcontractor: ABREST Energy Engineering LLC (Uzbekistan)
Facility: Thermal power plant with capacity of 525 MW
Works: Development the design and estimate documentation: “Power evacuation scheme for the facility: Construction of a 525 MW (450 MW) thermal power plant (TPP) in Syrdarya region”
Year: 2023
Customer: Khonobod Solar Energy LLC (Uzbekistan)
EPC contractor: Enter Engineering PTE LTD (Singapore)
Contractor: Abrest International Limited (UAE)
Subcontractor: ABREST Energy Engineering LLC (Uzbekistan)
Facility: Solar PV plant with capacity of 500 MW
Works: Development the design and estimate documentation: “Detailed design of step-up substation SS 500/35 kV photovoltaic power plant (PVS) with an installed capacity of 500 MW in the Pap district of Namangan region” for the facility “Construction of a photovoltaic plant in Namangan region”
Year: 2023
Customer: Khonobod Solar Energy LLC (Uzbekistan)
EPC contractor: Enter Engineering PTE LTD (Singapore)
Contractor: Abrest International Limited (UAE)
Subcontractor: ABREST Energy Engineering LLC (Uzbekistan)
Facility: Solar PV plant with capacity of 500 MW
Works: Development the design and estimate documentation: “Power evacuation scheme for the facility “Construction of a photovoltaic plant with an installed DC capacity of 500 MW in Namangan region”
Year: 2022
Customer: SkyPower Global (Canada)
Contractor: Abrest International Limited (UAE)
Subcontractor: ABREST Energy Engineering LLC (Uzbekistan)
Facility: Solar PV plant SkyPower Samarkand with capacity of 100 MW
Works: EPC turn-key basis (Engineering-designing, Procurement, Construction and Consulting) for the water supply and sewage system on the camp for the project “Construction of the Solar PV plant SkyPower Samarkand with capacity of 100 MW in Samarkand region”
Year: 2019
Customer: Tuyamuyin HPS
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: Tuyamuyin HPP
Works: Calculation of relay protection and automation (RP&A) settings for Tuyamuyin HPP
Year: 2019
Customer: Chalik Energy Sanayi ve Ticaret A.S. (Turkey)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: Multifunctional complex Tashkent Central Park (Trillion)
Works: Designing, approval of the project, passing the state expertise project for temporary (10 kV) and permanent (35 kV) external power supply for the construction of a multifunctional complex Tashkent Central Park in the city of Tashkent
Year: 2020
Customer: Angren TPS
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: Angren TPS
Works: Translation and elaboration of regulatory documents (job, operational and technical instructions)
Year: 2021
Customer: Navoiazot JSC
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: Navoiazot JSC
Works: Development of grid impact assessment and an external power supply scheme for a complex of production of polyvinyl chloride, caustic soda based on Navoiazot JSC (Stage II)
Year: 2021
Customer: Navoiazot JSC
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: Navoiazot JSC
Works: Development of the designing project “Removal of the existing 110 kV overhead line from the new construction area of Navoiyazot”
Year: Under execution
Customer: World Bank
Contractor: MRC Consultants and Transaction Advisers S.L. (Spain)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: National Electrical Grids of Uzbekistan JSC (NEGU)
Works: MUTS/CS-2/2: Consulting Services for Preparation of Transmission Network Development and Renewable Energy Integration Plan for JSC Uzbekistan National Power Networks (NEGU) under the projects of Modernization and reconstruction of substations of network grids
Year: 2022
Customer: AKSA Energy (Turkey)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 220 kV of AKSA Bukhara TPP
Works: Designing works of automatic elimination of asynchronous mode system
Year: Under execution
Customer: Cenergo (Turkey)
Contractor: Kontrolmatik Technologies (Turkey)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 240 MW CCPP at Tashkent area and 220 MW CCPP at Sirdarya region by Cenergo LLC
Works: Development and approval of the start-up and normal schemes, programs and consulting services to connecting to the grid “240 MW CCPP at Tashkent area by Cenergo LLC” and “220 MW CCPP at Sirdarya region by Cenergo LLC”
Year: 2022
Customer: SkyPower Global (Canada)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 100 MW PV Plant SkyPower Samarkand
Works: Development of the “Scheme for the output of power (power evacuation study) from a Solar PV Plant in the Samarkand region with a capacity of 100 MW” with the receipt of Technical Conditions for the connection of the PV plant to the unique electric system of the Republic of Uzbekistan
Year: Under execution
Customer: Navoiy Mining and Metallurgical Company (NMMC)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 200 MW PV Plant Navoiy Mining and Metallurgical Company
Works: Development of the “Scheme for the output of power (power evacuation study) from a Solar PV Plant in the Navai region with a capacity of 200 MW”
Year: 2022
Customer: Cenergo (Turkey)
Contractor: Kontrolmatik Technologies (Turkey)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 220 kV of Cenergo Tashkent TPP 240 MW CCPP
Works: Engineering and designing of emergency control automation system
Year: Under execution
Customer: Uzbekhydroenergo JSC
Contractor: Gidropoyekt JSC
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 2.03 MW Shahimardan MHPP, 5 MW Nijekoksu MHPP, 7.3 & 12.5 MW Kamchik MHPP 6.3 MW Dukentsay MHPP, 5.0 MW Ugam MHPP, 0.3MW Varganza MHPP, 1.26 MW Kli MHPP, 0.61 MW DGK MHPP, 3.5 MW Gissarak MHPP, 2.5 MW Akhangaran MHPP, 4.5 MW Zarchob-2 MHPP, 4.5 MW Zarchob-1 MHPP
Works: Development of the “Scheme for the output of power (power evacuation study) on the projects the construction of a new micro hydro power plants