Year: 2021
Customer: Masdar (UAE)
Contractor: SEPCO ІІІ / Shandong Tiejun Electric Power Engineering Navoiy (China)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: SS Karmana 220/33 kV of the 100 MW Solar PV Plant Navoi Nur Solar
Works: Construction works (civil construction, electrical installation, testing and commissioning) on the project construction of 100 MW Utility Scale Solar PV Plant in Navoi region for Uzbekistan Scaling Solar Project
Year: 2021
Customer: Masdar (UAE)
Contractor: SEPCO ІІІ / Shandong Tiejun Electric Power Engineering Navoiy (China)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 220 kV overhead transmission line (OHTL)
Works: Construction of a 220 kV overhead transmission line (OHTL) under the project construction of 100 MW Utility Scale Solar PV Plant in Navoi region
Year: 2021
Customer: Masdar (UAE)
Contractor: SEPCO ІІІ / Shandong Tiejun Electric Power Engineering Navoiy (China)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 100 MW Solar PV Plant, 33 kV substations and cables of PV area of the 100 MW Solar PV Plant Navoi Nur Solar
Works: Testing and commissioning works of electrical equipment of 100 MW Solar PV Plant in Navoi region
Year: 2022
Customer: Total Eren (France)
Contractor: Metka (Greece) / An Excellent Idea LLC
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 100 MW Solar PV Plant, 33 kV cables of PV area of the 100 MW Solar PV Plant Tutly Solar
Works: Testing and commissioning works of electrical equipment of 100 MW Solar PV Plant in Samarkand region
Year: Under execution
Customer: SkyPower Global (Cayman)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 100 MW PV Plant SkyPower Samarkand
Works: Pile pull-out test for PV plant with a capacity 100 MW in Samarakand region
Year: Under execution
Customer: SkyPower Global (Cayman)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 100 MW PV Plant SkyPower Samarkand
Works: Geotechnical surveys and consulting services for the Solar PV Plant project with a capacity of 100 MW in Samarakand region
Year: Under execution
Customer: Navoiy Mining and Metallurgical Company (NMMC)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 200 MW PV Plant Navoiy Mining and Metallurgical Company
Works: Development of the “Scheme for the output of power (power evacuation study) from a Solar PV Plant in the Navoi region with a capacity of 200 MW”