Year: 2019
Customer: Uzbekenergo JSC (TPP JSC) Navoi TPT
Contractor: Mitsubishi (Japan) / Chalik Energy / Uzelektroapparat-Electroshield JSC / Barki Montaj Naladka LLC (Uzbekistan)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: HT panels 220 kV of Navoi TPP & Switchgear for own needs 6 kV
Works: Electrical installation, Testing and commissioning works of electrical equipment and RP&A, AIMSCEM on the project “Expansion of the Navoi TPP during the construction of the second CCGT with a capacity of 450 MW”
Year: 2019 – 2020
Customer: Uzbekenergo JSC (TPP JSC) Navoi TPT
Contractor: Mitsubishi (Japan) / Chalik Energy / Uzelektroapparat-Electroshield JSC / Barki Montaj Naladka LLC (Uzbekistan)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 220 kV of Turakurgan TPP & Switchgear for own needs 6 kV
Works: Electrical installation, Testing and commissioning works of electric equipment and RP&A, AIMSCEM on the project “Construction of Turakurgan TPP Combined type 2×450 MW SS 220/10/10 kV”
Year: 2021
Customer: Uzbekhydroenergo JSC
Contractor: Trans Servis Kompleks LLC
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 35 kV Angren TPP
Works: Electrical installation, testing and commissioning works of electrical equipment and apparatus of RP&A
Year: Under execution
Customer: Navoiazot JSC
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS-110 kV Navoi TPP
Works: Commissioning works of electrical equipment and apparatus of RP&A
Year: 2021
Customer: Angren TPP JSC
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: Annual preventive maintenance and commissioning in 2021 of Angren TPP
Works: Preventive maintenance and commissioning of electrical equipment and RP&A devices
Year: 2020 – 2021
Customer: AKSA Energy (Turkey)
Contractor: Kontrolmatik Technologies (Turkey)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 110 kV of AKSA Tashkent TPP
Works: Electrical installation, testing and commissioning works of electrical equipment and RP&A devices on the project “Construction of a combined cycle gas power plant with a capacity of 470 MW in Tashkent region”
Year: 2020 – 2021
Customer: AKSA Energy (Turkey)
Contractor: Murel Yapı İnşaat A.Ş. (Turkey)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: 11 kV switchgear of AKSA Tashkent TPP
Works: Testing and commissioning works of electrical equipment, RP&A devices and motors
Year: 2021
Customer: AKSA Energy (Turkey)
Contractor: YEO Energy Industry Solutions (Turkey)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 220 kV of AKSA Bukhara TPP
Works: Testing and commissioning works of RP&A devices on the project “Construction of a combined cycle gas power plant with a capacity of 270 MW in Bukhara region”
Year: Under execution
Customer: Odaş Enerji (Turkey)
Contractor: Kontrolmatik Technologies (Turkey)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 110 kV of ODAŞ Energy TPP
Works: Electrical installation, testing and commissioning works of electrical equipment and RP&A devices on the project “Construction of a combined cycle gas power plant with a capacity of 176 MW in Khorezm region”
Year: 2022
Customer: AKSA Energy (Turkey)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 220 kV of AKSA Bukhara TPP
Works: Designing, installation, testing and commissioning works of automatic elimination of asynchronous mode system
Year: 2022
Customer: AKSA Energy (Turkey)
Contractor: Kontrolmatik Technologies (Turkey)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 110 kV of AKSA Tashkent TPP 470 W
Works: Designing, installation, testing and commissioning works of emergency control automation and main line protection
Year: Under execution
Customer: Navoi TPP JSC
Contractor: Barki Montaj Naladka LLC (Uzbekistan)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS-220 kV Navoi TPP
Works: Construction and installation works on the object “Installation and installation of two autotransformers with a capacity of 250 MVA to replace the existing autotransformers with a capacity of 180 MVA at Navoi TPP”
Year: 2022
Customer: AKSA Energy (Turkey)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 110 kV of Tashkent TPP
Works: Installation, testing and commissioning works of emergency control automation and main line protection
Year: 2022
Customer: Cenergo (Turkey)
Contractor: Kontrolmatik Technologies (Turkey)
Subcontractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: AIS 220 kV of Cenergo Tashkent TPP 240 MW CCPP
Works: Designing, installation, testing and commissioning works of emergency control automation
Year: 2022
Customer: Calik Enerji Sanayi Ve Ticaret A.S. DM (Turkey)
Contractor: Abrest Energy Engineering LLC (Uzbekistan)
Facility: Tashkent CHPP
Works: Installation, testing and commissioning works of temporary power supply construction of a new unit Tashkent CHPP